상단메뉴 바로가기 본문 바로가기 본문 하위메뉴 바로가기 하단 바로가기

Q&A

HOME Community Q&A

Q&A

Q&A

test

관리자   /   2018-09-28

 

Mechanical / Hydraulic

 

System MC, Pro-commissioning, Commissioning, Start-up Test, Rotating Machinery Installation, Alignment,

 

Unit Pre-start-up Test and Operation, Marine Utility System Installation and Test, Drill-ship Top Side NOV Equipment Operation Under NOV Supervision

 

 

 

Piping, Hydro test, Leak test (Helium Gas)

 

Piping /tubing fabricating & Installation, High pressure Hydro test, Line Flushing, Sensitive Leak test and Function test, Field Modification, Repair and Punch Rectification

 

 

 

Electrical and I&C

 

Field Instrument Calibration, Cable Pulling & Connection, Fiber Optical Cable Connection & test,

 

I/O Validation Check (Loop test, F&G, Cause & Effect test), PLC & Device-net Programming and commissioning, Electrical testing(Sequence, No load test)

 

 

 

Drilling / Sub-sea test

 

Drilling Equipment Installation & Test, Sub-sea Line Function Check

 

 

 

Installation / Hook-up

 

Mechanical / Piping, Elec. / Inc. & HVAC, Drilling Cub-sea Team

 

게시글에대한 코멘트 작성
Name : Password :
reply
all >